Independent directory. Not affiliated with or endorsed by the U.S. Department of Defense (Department of War). Owned and maintained by the nonprofit Creating Coding Careers.About this site
Apollo Mission Critical Engineering, LLC

Data Center Construction QA/QC Engineer in Training Program - On the Job Training

Job Training All branchesDefense Industrial BaseNational Security

Website provided by the program.

At a glance

Open to
All branches
Format
In person
Length
121 - 150 days
Locations
1 location in Ohio
Job locations
Arizona, Georgia, Ohio, Oregon, Virginia
Career field
Architecture and Engineering
Target MOS/ratings
All

About the program

Apollo’s SkillBridge Program equips transitioning service members with the technical skills, field experience, and industry certifications needed to thrive in the data center commissioning sector. We are seeking highly motivated service members to participate in our Mechanical Data Center Commissioning Engineer Training Program, where trainees will gain hands-on experience working on mission-critical projects under the mentorship of senior engineers. This immersive program emphasizes attention to detail, high-pressure performance, and the fundamentals of data center electrical commissioning, preparing participants for a successful future in data center operations and commissioning, with the potential for full-time employment post-transition. Activities will include but are not limited to testing and/or validation of chillers, water loops/components, cooling distribution equipment, air handling units (AHUs), air conditioning units, fan coil units (FCUs), pumps, heat exchangers, cooling towers, humidification systems and Building Management and Automation Systems (BMS).

Jobs this program prepares you for

•Conduct commissioning activities for mechanical systems, their electrical components and BMS systems in data centers. •Create and implement detailed commissioning plans, procedures, and checklists for Level 2, Level 3, Level 4, and Level 5 systems. •Review and evaluate design documents, submittals, and equipment specifications. •Conduct site inspections, functional performance tests, and system verifications. •Witness testing of all equipment during commissioning and validate sequence of operations. •Work closely with project teams, including contractors, engineers, and data center operators. •Help accomplish team goals both on-site and remotely as necessary. •Diagnose and resolve system performance, reliability, and safety issues. •Document results/findings and generate comprehensive commissioning reports. •Provide support to data center staff on system operation and maintenance. •Ensure adherence to industry standards, codes, and regulations. •Attend project meetings and offer technical expertise as needed to help accomplish team goals. •Other duties as assigned.

Eligibility & prerequisites

Application: https://apollomce.bamboohr.com/careers/83

https://apollomce.bamboohr.com/careers/83

Locations & contacts

Loading map…

How to apply

  1. Contact the provider using the website or email above. Ask about openings, start dates, and the application.
  2. Confirm eligibility. SkillBridge is generally for service members within 180 days of separation who have their command's approval.
  3. Get your unit commander's authorization following your branch's SkillBridge process. Start early; approvals take time.
  4. Read reviews from past participants on Rate My SkillBridge.

Policy details: official DoW SkillBridge site · our FAQ