# Data Center Construction QA/QC Engineer in Training Program - On the Job Training

Provider: [Apollo Mission Critical Engineering, LLC](https://programs.cccareers.org/providers/apollo-mission-critical-engineering)

- Program type: Job Training
- Branches: All branches
- Format: In person
- Length: 121 - 150 days
- Locations: Columbus, OH
- Website: https://apollomce.com
- Contact: Pierre Sackey, pierre.sackey@apollomce.com
- Page: https://programs.cccareers.org/programs/apollo-mission-critical-engineering-llc-data-center-construction-qa-qc-g6zn46

## Summary

Apollo’s SkillBridge Program equips transitioning service members with the technical skills, field experience, and industry certifications needed to thrive in the data center commissioning sector. We are seeking highly motivated service members to participate in our Mechanical Data Center Commissioning Engineer Training Program, where trainees will gain hands-on experience working on mission-critical projects under the mentorship of senior engineers. This immersive program emphasizes attention to detail, high-pressure performance, and the fundamentals of data center electrical commissioning, preparing participants for a successful future in data center operations and commissioning, with the potential for full-time employment post-transition. Activities will include but are not limited to testing and/or validation of chillers, water loops/components, cooling distribution equipment, air handling units (AHUs), air conditioning units, fan coil units (FCUs), pumps, heat exchangers, cooling towers, humidification systems and Building Management and Automation Systems (BMS).

## Job description

•Conduct commissioning activities for mechanical systems, their electrical components and BMS systems in data centers. •Create and implement detailed commissioning plans, procedures, and checklists for Level 2, Level 3, Level 4, and Level 5 systems. •Review and evaluate design documents, submittals, and equipment specifications. •Conduct site inspections, functional performance tests, and system verifications. •Witness testing of all equipment during commissioning and validate sequence of operations. •Work closely with project teams, including contractors, engineers, and data center operators. •Help accomplish team goals both on-site and remotely as necessary. •Diagnose and resolve system performance, reliability, and safety issues. •Document results/findings and generate comprehensive commissioning reports. •Provide support to data center staff on system operation and maintenance. •Ensure adherence to industry standards, codes, and regulations. •Attend project meetings and offer technical expertise as needed to help accomplish team goals. •Other duties as assigned.

## Locations

- Columbus, OH

Source: public DoD SkillBridge listings via CCC Programs. Confirm details with the provider and your chain of command.
